Established in 1978 as the first organized industrial zone of Tokat province, Tokat OIZ has become the OIZ that provides the most employment in the 43 years it has left behind. 162 of 186 industrial parcels in Tokat Organized Industrial Zone of 478 hectares have been allocated. There are 14 parcels ready for allocation. In Tokat OIZ, where 5000 people are employed, the sector that creates the most employment is the ready-made clothing and apparel sector with a rate of 48. 35% of the enterprises operating in the manufacturing sector are in the food sector; 15% in the textile and ready-made clothing sector; 9% of them operate in the forest products sector.
Discounted Land Allocation Fee: 40-80 TL/ m² (Price between 40-80 TL is determined by the decision of the Board of Directors)
Parcel Sizes: 2.000 – 65.000 m²
Natural Gas Infrastructure: Available
Central Waste Water Treatment Plant: Available
Distance to Samsun Port: 250 km
Distance to railway: 45 km
Distance to airport: 20 km
TOKAT CENTRAL DISTRICT | |
---|---|
Population | 203.395 |
Distance to City Center | - |
Number of Small Industrial Sites | 1 |
Is there a Chamber of Commerce and Industry? | Yes |
Is There a University Educational Institution? | Yes |
Is There Natural Gas In The District Center? | Yes |
Social Development Index Development Group* | 1 |
*In the study conducted by OKA, there are 5 development categories, with "1" being the most developed and "5" being the least developed.
TOKAT OIZ | |
---|---|
General Information | |
Foundation Year | 1978 |
WEB Site | - |
Major Sectors | 1- Ready-to-Wear Garment Industry 2- Food Industry 3- Metal Goods Industry 4- Forest Products Industry |
Location | |
Nearest Highway | 3 Km |
Nearest Port | 250 Km |
Nearest Railroad | 45 Km |
Nearest Airport | 15 Km |
Parcel | |
Size (Hectares) | 478 HA |
Industry Parcel Number Allocated To be allocated |
186 162 14 |
Parcel Sizes (m2) The biggest Smallest |
65.317 2.043 |
Number of Active Firms | 157 |
Number of Employees | 5000 |
Energy Infrastructure | |
Electric Installed Power | 25 MVA |
Is There a Natural Gas Network? | Available |
Water supply | Transmission line |
Is There a Central Waste Water Treatment Plant? | No |